Nr Alslev Station
Year: 2021
In connection with the construction of the track from Ringsted to Fehmarn, Banedanmark builds Nr. Alslev Station about.
The whole station moves a little south and gets a footbridge with lifts. The current pedestrian tunnel will be preserved, so there are more opportunities to cross the track. In addition, there will be new reading sheds and noise screens on both sides of the track.
The images show the locations of the new track elements. The images, which are kept in a semi-realistic style, give a clear understanding of how the station will look in the future.



