Hvidemøllevej Bridge (20994)
Year: 2021
As part of the preparations for the electrification of the railway, Banedanmark is building a new bridge at Hvidemøllevej. The existing bridge, which carries Hvidemøllevej over the track, must be replaced with a new, higher-lying bridge, which makes room for the future running current system. When the track in approx. five years is ready for electric-powered trains, it allows for shorter journey times and more stable operation, just as the train journey becomes even more environmentally friendly.
The images show the location of the old bridge, as a "Ghost model", as well as how the new bridge will change the course of the future road. The images also show the re-establishment of the parking facility.
Stemningsbilledet af broen til brug på hjemmesider og borgermøder.